Wooden houses 80 sq m. Projects of small houses

Accounting and taxes 18.04.2020
Accounting and taxes

A person dreams of building his own home by purchasing a country plot. To do this, you need to create a project for the future structure. To choose the appropriate option, you can study photos of private houses of 80 square meters. m. They will help you decide what the building being built will look like. When selecting a project, the type of building materials, number of floors, and number of rooms are taken into account.

Design Features

To reduce the building area, two-story buildings or buildings with attics are erected. If it allows land plot, then it’s better to stay with the one-story option. When there is not enough space, preference is given to buildings with two levels. At the same time, there will be an area for a garden and vegetable garden.

Compact buildings do not impose restrictions on the design of the exterior. When creating house projects up to 80 sq. m experts pay attention not only to the appearance, but also to the arrangement of the space inside the building.





Due to the limited space, it is necessary to carefully consider the placement of premises and their sizes. The building should be cozy and comfortable to live in.

When drawing up documentation, the location of window openings and doors is taken into account. The compact dimensions of the building provide only necessary premises: kitchen, living room, bedrooms, bathroom, storage room.

If this country house, then the living room and kitchen are made larger so that they can comfortably receive guests. The heating boiler is placed in the kitchen or in a separate room. This depends on the design of the device and its size.

Choosing a private house project

A compact home should be comfortable and convenient. Part of the area is allocated for the bathroom, kitchen and utility rooms. It is necessary to complete the communication wiring diagram. The work is carried out in strict accordance with technical standards.

Having decided how often people will live in the building and how many people are in the family, they select a layout. You should consider how often you have guests. High requirements in terms of functionality and reliability are required for buildings for permanent residence.

Houses with an area of ​​80 sq. m are popular. They are built from brick, profiled timber, foam concrete. The features of the structure being built depend on the material chosen by the customer. A practical and economical building suitable for a small family.




The building does not occupy a large area on the site. Construction can be carried out in the city or outside it. The layout of a house of 80 m2 should be carried out by specialists.

Custom design will allow you to take into account all the client’s wishes. The customer may need a separate room for a gym, recording studio, etc. These features must be taken into account when developing documentation.

Advantages of small one-story buildings

Simple structures are easy to build and repair. When building such an object, you do not need to overpay for the need to supply materials to a height. One-story houses of 80 square meters have rooms on the same level. This is convenient for families with children and elderly people.

It is easy to insulate such a structure; there is no need to use scaffolding for finishing. Two-story buildings usually have more window openings and doors, which increases heat loss. The staircase that leads to the upper level of the house is not cheap.

The foundation of a one-story building occupies a large area, but it can be made lighter. Such a structure does not place much stress on it. The length of the roof is also greater, but its installation and repair work is easier to complete. Heating a house of 80 sq. m is easier to do if it has only one level. The area of ​​the building is often increased by adding an attic.

Selection of materials for building construction

Before the beginning design work determined by materials. When choosing, you need to take into account their cost. You can reduce costs if you use lightweight material. In this case, a powerful base is not needed. If the building is not insulated, heating costs will be high in winter. Before purchasing materials, calculations should be made taking into account climatic conditions.




To reduce time and labor costs buy blocks large sizes, from which it is easy to erect a structure. Purchasing some modern materials will allow you to avoid additional finishing.

You can build a house from timber; rounded or profiled versions are often used. This is an environmentally friendly material, characterized by accessibility and practicality.

The traditional building material is brick. Houses made from it can last up to 150 years. It perfectly protects from strong wind and rain, heat and cold.

A modern, durable ceramic block allows you to quickly and inexpensively build housing. It has a grooved surface and there are pores inside. The low weight and high strength of ceramic blocks allow the construction of buildings of several floors.

Aerated concrete blocks retain heat excellently and do not deteriorate over time. When laying, no additional leveling is required; the material has a smooth surface.

Frame technology was created to make housing construction cheaper. It is distinguished by its high assembly speed. The basis of the property is a metal or wooden frame on which insulation is mounted. The top of the building is covered with sheets of chipboard and OSB.

Interior and exterior of the building

It is necessary to think in advance appearance, as well as the internal arrangement of the building.

Unlike an apartment, in a private house they use any design techniques. In the interior space of the building, you can turn your ideas into reality to create an attractive and comfortable home.



The interior of the house is done in the style you like. Modern buildings have large windows and high ceilings. You can expand the space visually if you use a light palette and mirror surfaces. It is important to choose the right lighting.

Home design requires special attention. The well-being and mood of the residents depend on the design of the interior space. Therefore, the chosen direction should be to the taste of the owners.

It is also worth taking care of the facade of the building. It should be attractive and functional. Professionals will help you cope with the task; they will be able to help the owners of the site make their choice, develop documentation and carry out all construction and finishing work.

Conclusion

You can use a combination of different materials when constructing a building. This will allow you to create an original property that meets all the wishes of the owners. It is necessary to draw up a house plan in advance to take into account all the nuances. By purchasing one of the projects or making an individual order, the client will receive comfortable and convenient housing as a result.

Photos of houses 80 sq. m.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    external finishing: the walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, manufactured locally, based on technical specifications visualization, painted. The base is lined with decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Project for his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made using our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, this was precisely the difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new one modern form with interesting innovations! The house now has an entrance area where you can sit at a table on cozy evenings and a complex but possible in our area exploitable roof. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, built-up roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is decorated with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the section of country architecture in the high-tech style, a style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow up quickly and in their own home in nature there are many opportunities and Fresh air. We, in turn, were glad to work on an individual house project in classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, and make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations according to preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also, the exact timing of construction was important for Dmitry; in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden on wooden beams, in places of large spans installation of LVL beams. The basement floor is insulated with 200mm basalt insulation; interfloor ceiling with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; The color scheme was proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! Choice of technology long work on the project, building the foundation, building the house with exterior finishing and then working on the interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also spent a long time working on the estimate, combining different finishing options and comparing their costs. This allowed me to choose best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation was erected - USHP. Next, work began on the box. A frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the proud owner own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received a gift of reinforced concrete floors, one of the leading construction teams and a house according to the design he liked, which stood on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house good people and they recommended us to someone else to a good person! Andrey Rumyantsev came to our company with the desire to build a one-story spacious country house with a fireplace for warm family evenings on the site of an old country house... It was decided to build the house from aerated concrete blocks so that the future handsome country man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone house construction - warm, affordable, beautiful, reliable. Modern technologies We have stepped forward so much that such unique configurations become available in a short time, because we built this project over the winter months. The main thing is to have the necessary knowledge and constantly replenish it!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels under the Tolento stone were added. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    The owner of a house “brought to life according to his idea and sketch!”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to relax in nature in a wooden house, but it was necessary to build a house in a short time, and frame construction technology became the ideal solution for such problems! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

    It all started with individual project, found by the Customer’s family on a European website. It was with him that she came to our office for the first time. We made preliminary calculations for the project, took a tour of the existing construction site, shook hands and work began to boil! The architect improved and adapted the project to the site and the Client’s family; the foreman “planted” the house on the site. Based on geological surveys, it was decided to place the house on bored piles. The frame grew in a few weeks, then the roofing, insulation, exterior finishing! Behind winter period a house grew on the site. The customer invited a third-party technical supervisor who monitored the process independently of our multi-stage control. The color scheme for painting the imitation timber was selected by our manager and here in front of us is the bright and cozy country house of the Pushkov family’s dreams!

Beautiful guest house projects: photos, catalog

Often, in parallel with the construction of the main house, additional buildings begin to appear on the site, the purposes of which are varied. This can be not only the obligatory garage, barn, but also mini cottages, small house projects presented in this section. The presence of these buildings on the site is dictated by the desire to diversify your life or comfortably accommodate guests in it, while maintaining your usual course of life.

Economy private house projects from the Z500 company are characterized by a comfortable layout and pleasant design.

Layout of guest house projects: options and their advantages

The catalog of economy class house projects Z500 offers a wide variety of layouts. Guest house plans can vary depending on what the owners expect from them.

  • Guest house projects are often combined with a summer kitchen - a separate room in which you can not only relax in the summer in the best possible way, cook food, but also barbecue.
  • The layout of guest houses can be developed for the purpose of temporary accommodation of owners during the construction of the main cottage. After the move, the guest house will be used for its intended purpose - for receiving guests or accommodating parents.
  • Often, a guest house and a bathhouse, the projects of which we implement at average market prices and have collected in our catalog, can be located on the site in close proximity. If necessary, using a custom design service, it is possible to provide for their complete combination.
  • The project of a guest house with a swimming pool, a summer kitchen or a terrace will provide additional space for quality relaxation and a good holiday with family and friends.
  • The project of a guest house with a garage or a solid fuel boiler room that provides a backup source of energy and generates heat for the entire site will be an indispensable solution.


Projects of small houses Z500

Guest house projects, photos, videos, diagrams, sketches and drawings of which can be viewed in this section, despite the inability to initially calculate total cost turnkey construction has gained great popularity (including in 2018) among those who have private country cottages. Economy guest house projects can improve the comfort of living outside the city.

The design of the guest house will depend on the needs, views and resources of the developer. These can also be compact guest rooms one-story houses, the area of ​​which does not exceed 40-50 m2 (the design of a small guest house is suitable for a compact plot). Wherein budget plan home may be distinguished by the absence of a bathroom and kitchen. Or it will be guest house projects with barbecue, which are a full-fledged two-story cottage with a double fireplace, spacious rooms and several bedrooms, which may have the original design of guest house projects.

When deciding to buy from our company ready-made projects garden houses or order individual plans guest house projects, the client can count on receiving detailed project documentation, which includes 5 sections: an engineering section consisting of three sections (heating and ventilation, water supply, electricity), a structural section and an architectural section. Engineering project sections are purchased at an additional cost.
We have posted an example of project documentation.

All individual and standard projects mini houses are protected by copyright, which guarantees the legal security of developers during the construction of residential buildings according to projects of the Z500 company. A certificate that confirms that our company is the official representative of the international architectural bureau Z500 Ltd."

We offer for viewing this section a catalog that contains economical house designs. We wish you to find and successfully implement on your site a small house project that suits you!

The KostromaTerem company offers reliable and durable houses made of 80 sq. m. timber. m., which contain everything a modern family needs for a comfortable stay. All buildings meet the requirements of current standards and can be used for both seasonal and permanent residence.

Economical housing with a convenient layout

Our catalog presents various designs of houses of 80 sq. m. m.:

  • with and without attic;
  • with a small veranda or a spacious terrace;
  • with an open balcony or glazed loggia.

Roofs of houses made of wood 80 sq. m., depending on your preferences, can be made gable, multi-slope or combined. Used as covering various materials– soft roofing, metal tiles, ondulin, etc.

Advantages

Features of houses made of profiled timber 80 m2:

  • Low cost.
  • High speed construction.
  • Well-planned arrangement of premises.
  • Functionality and ease of use.

The small area of ​​timber houses is 80 sq. m. provides minimum expenses on public utilities. Regular maintenance of such housing is much easier than for mansions with dozens of rooms.

How we build

  • The KostromaTerem company is a manufacturer of lumber, so our prices for the construction of houses are 80 sq. m. below the market average both in Moscow and Kostroma. Additionally, there are discounts and seasonal promotions.
  • Construction is possible at any time of the year.
  • In addition to construction, we provide thermal insulation and finishing services wooden houses 80 sq. m. turnkey, development and installation of heating, ventilation and air conditioning systems, we carry out electrical installation work.

Contact our specialists for advice!

We recommend reading

Top